Envío a todo Costa Rica por solo ₡1490 

Enviar a
Costa Rica
0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional

Selecciona tu país

América

Europa

Resto del mundo

portada Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR 50.54(m) (en Inglés)
Formato
Libro Físico
Editorial
Idioma
Inglés
N° páginas
110
Encuadernación
Tapa Blanda
Dimensiones
28.0 x 21.6 x 0.6 cm
Peso
0.27 kg.
ISBN13
9781500141004

Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR 50.54(m) (en Inglés)

Commission, U. S. Nuclear Regulatory (Autor) · Createspace · Tapa Blanda

Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR 50.54(m) (en Inglés) - Commission, U. S. Nuclear Regulatory

Libro Nuevo Importado
Envío: 10 a 12 días háb.
₡ 11.434
Costos de importación y 13% IVA incluídos en el precio ✅
Libro Nuevo

Quedan 100 unidades

₡ 11.434
Llega entre el 20 Jul y el 24 Jul a Costa Rica. Seleccionar ubicación

Reseña del libro "Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR 50.54(m) (en Inglés)"

Regulations set forth by the U.S. Nuclear Regulatory Commission (NRC) prescribe the qualifications and staffing levels for licensed operating personnel for nuclear power plants. The introduction of advanced reactor designs and increased use of advanced automation technologies in existing nuclear power plants will likely change the roles, responsibilities, composition, and size of the crews required to control plant operations. Current regulations regarding control room staffing, which are based upon the concept of operation for existing light-water reactors, may no longer apply. Therefore, applicants for an operating license for an advanced reactor, and current licensees who have implemented significant changes to existing control rooms, may submit applications for exemptions from current staffing regulations. The NRC staff is responsible for reviewing the exemption requests and must determine whether the staffing proposals provide adequate assurance that public health and safety will be maintained at a level that is comparable to that afforded by compliance with the current regulations.

Opiniones del libro

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes